Add events with a date, then drag the circular marker along the red line.
The date updates based on position, and the duration between adjacent events is recalculated automatically.
Not logged in
Dragging uses daysPer100px.
Enter a number in Timeline scale (days per 100px), e.g. 3 or 7.